The N999 Tortue FPSO’s completion ceremony, the most significant gas processing floating production in the world, storage and offloading platform designed and built by COSCO SHIPPING Offshore, was held on 9 September, per the firm’s release.
It is reportedly BP’s first FPSO assignment in China. With an LOA of about 270 meters, a moulded beam of 54 meters with a moulded depth of 31.5 meters, the vessel has a deck area that equals two soccer fields, a height that is comparable to almost a vast...