The board of directors of the Bilbao Port Authority has unanimously approved the call for a public tender for the building and operation of a box terminal on the central quay of the Spanish port.
The central quay is the last large area of the port of Bilbao for which a concession can be awarded.
The process is carried out in two stages. The first phase, which is completed, has resulted in an operating surface area of more than 300,000 m², with 232,530 m² now accessible, following the concession...