NES to deliver shoreside charging stations for Fjord1 autonomous ferries

Capt. John

Norwegian ferry operator Fjord1 has contracted Norwegian Electric Systems (NES) to deliver two shoreside charging stations for use by the four autonomous, zero-emission ferries that it will operate on the Lavik-Oppedal crossing on the west coast of Norway (see earlier story).

Lavik-Oppedal route is a 5.6 kilometer (about 3.5 miles) long route that crosses the Sognefjord, on the west coast of Norway. It is designated as national road ferry connection E39 by the Norwegian Public Roads...

https://www.marinelog.com/passenger/ferries/nes-to-deliver-shoreside-charging-stations-for-fjord1-autonomous-ferries/

Leave a Comment