Operation on high thermal load damages engine

Capt. John

The Swedish Club provides lessons learned from a machinery failure. Namely, the main engine, a six cylinder medium speed type, had serious damage and had to be renewed. Moreover, the turbo charger had to be overhauled.

The incident

A vessel was in ballast and at anchor, waiting for further instructions. After seven days the weather got worse and the ship’s anchor dragged. The anchor was heaved up and the vessel started to slow steam in the area.