Construction starts on US Navy’s 15th Spearhead-class fast transport

Austal USA has begun construction on the 15th Spearhead-class expeditionary fast transport (EPF) slated for the US Navy. Like its sisters, the future USNS Point Loma will ..

The post Construction starts on US Navy’s 15th Spearhead-class fast transport appeared first on Baird Maritime.

https://www.bairdmaritime.com/work-boat-world/maritime-security-world/naval/naval-auxiliary-support-vessels/construction-starts-on-us-navys-15th-spearhead-class-fast-transport/

Austal USA successfully completes sea trails for Navy’s Expeditionary Fast Transport 12

Austal USA and the Navy’s Expeditionary Fast Transport (EPF) program successfully completed integrated trials on the future Newport (EPF 12), in the Gulf of Mexico. The 337’10″x93″6″ ship is now ready to be delivered to the Navy.

Austal USA has delivered 11 EPFs and has two more under construction, including EPF 12, at its Mobile, Ala., facility. The Spearhead-class EPF is currently providing high-speed, high-payload transport capability to fleet and combatant commanders.

Four MTU 20V8000 M7 11...

https://www.workboat.com/news/shipbuilding/austal-usas-expeditionary-fast-transport-12-successfully-completes-sea-trials/

Austal USA launches another Expeditionary Fast Tranport Ship

Austal USA, Mobile, Ala., launched the future Expeditionary Fast Transport ship Newport (EPF 12) into the Mobile River on Feb. 20. This is the first Navy ship that Austal has launched in 2020. The 338’x93’6″ Newport is one of 14 that the Navy has contracted Austal to build. The next step is sea trials and then delivery before the end of the year.

The Spearhead-class EPF, a high-speed catamaran with a 13′ draft, provides high-payload transport capability to U.S. combatant commanders around the...

https://www.workboat.com/news/shipbuilding/austal-usa-launches-another-expeditionary-fast-tranport-ship/

Join Our Newsletter
Enter your email to receive a weekly round-up of shipping news.
icon