From the STS operation with the Pskov (at the front) and Vladimir Rusanov
On 24 November 2018, the LNG carrier Pskov successfully completed the first LNG ship-to-ship transfer operation for the Yamal LNG Project. Pskov loaded some 170,000 cubic meters of liquefied gas, which was delivered from the Port of Sabetta (Yamal Peninsula) to the transshipment point by one of the Arctic LNG carriers chartered by Yamal LNG.
The cargo transshipment was carried out at the safe anchorage off the port of...
http://www.allaboutshipping.co.uk/2018/11/26/lng-carrier-pskov-completes-first-open-water-sts-transfer-for-yamal-lng/