PSC focus: China performance in H12018

During first half of 2018, PSCOs conducted in China a total of 4,141 inspections which resulted to 15,135 deficiencies and 158 detentions. This led to a detention rate of 3.82% and an expected number of deficiencies per inspection 3 to 4. At the same time, the overall Tokyo MoU figures for the same period show a detention rate of 2.25% and deficiencies per inspection 1 to 2 (1.98).

Key Figures (China PSC Q1&Q2 2018)

Total Inspections4,141
Total Deficiencies15,315
Total Detentions158
To...

https://safety4sea.com/cm-psc-focus-china-performance-in-h12018/

Leave a Comment

Join Our Newsletter
Enter your email to receive a weekly round-up of shipping news.
icon