The new sea lock project proceeds

Capt. John

November and December will be dominated by the transportation of the lock gates from South Korea, the sinking operation of the lock gate chamber of the outer head (number 1 in the picture) and the construction activities on the walls of the flood defence (number 2 in the picture). Meanwhile, work is continuing on the walls of the inner head (number 3 in the picture).

Ship with lock gates is underway from South Korea to IJmuiden

The three lock gates – steel structures weighing 2,900 tons each –...

http://container-news.com/sea-lock-project-proceeds/

Leave a Comment