BIO-UV Group has completed successfully the testing of an enhanced BIO-SEA ballast water treatment system designed to reduce further the time in which treated water has to be held onboard prior to discharge overboard.
Holding time is the minimum period between the uptake and discharge of ballast water to ensure it has been properly treated.
The technical advancement BIO-UV Group has made in UV-C technology, however, has shown that holding time can be reduced also in brackish water open seas.
Image...