At the end of June, GTT has received an order from the EPC1 contractor, China Petroleum Engineering and Construction Corp. North China Company (CPECCNC), for the design of the containment system for a 29,000 m3 Membrane Full Containment onshore tank intended for the Hejian LNG Peak shaving plant....