- BIO-UV Group reports that its ballast water treatment system BIO-SEA has successfully passed IMO G8 testing without any operational restrictions.
- From October 2021, tests will be required to verify installed systems are compliant with the D2 standard during the commissioning process.
- The BIO-SEA range of ballast water treatment systems have been designed for flow rates between 10m3/h and 2,000m3/h.
BIO-UV Group’s ballast water treatment system BIO-SEA has successfully passed all land and...