New terminal construction underway at Port of Gothenburg

The Port of Gothenburg is constructing a new terminal situated on approximately 180,000 cubic metres of dredging spoils re-used as filling material. The new terminal will ..

Capt. John
Author: Capt. John

https://www.bairdmaritime.com/ship-world/port-world/new-terminal-construction-underway-at-port-of-gothenburg/

Leave a Comment