Keppel seals $2.3bn FPSO contract with Petrobras

Capt. John

Brazilian oil major Petrobras has placed an order at Singapore’s Keppel Shipyard to build the P-78 floating production storage and offloading (FPSO) unit to be installed in the Búzios field, in the Santos Basin pre-salt area in 2024. Under the $2.3bn contract, Keppel Offshore & Marine (O&M) will...

https://splash247.com/keppel-seals-2-3bn-fpso-contract-with-petrobras/

Leave a Comment

Join Our Newsletter
Enter your email to receive a weekly round-up of shipping news.
icon