Crane builder Liebherr and offshore wind vessel operator Seaway 7 experienced a setback in the construction of monopile-installation vessel (heavy load carrier) Alfa Lift (IMO 9889980) after an “unplanned movement” of a key crane component on the ship necessitated a technical investigation. Alfa Lift was ordered by offshore wind specialists OHT in 2018. OHT merged…
The post Unexpected crane movement slows vessel construction appeared first on Insurance Marine News.
Author: Capt. John