At the end of September 2021, the 19,000dwt heavy lift multipurpose vessel, the AAL Nanjing, loaded four large chimney sections, with a combined weight of close to 500 metric tonnes and 6,000 cubic metres in size. The units were manufactured and loaded in Humen, China, and shipped long-haul along AAL Shipping’s (AAL) popular ‘Asia – West Coast Australia Monthly Liner Service’ (AUWC) to Henderson in Australia for installation at the Kwinana Waste to Energy (WTE) Plant – the first thermal...