Update on German LNG Terminal

Capt. John

Gasunie and the Kreditanstalt für Wiederaufbau have signed a Memorandum of Understanding to take the project into a next phase and start the joint construction of the LNG terminal.

Author: Capt. John

https://www.tanksterminals.com/terminals/07032022/update-on-german-lng-terminal/

Leave a Comment