Petrobras awarded Radix a contract to develop projects for Floating Production, Storage, and Offloading (FPSOs). The agreement will last 31 months, with services estimated at $11.5M (USD). The contract includes developing multidisciplinary engineering…
Author: Capt. John
https://www.marinelink.com/news/radix-wins-m-contract-petrobras-508190