Solar And Wind Power Generation Begins At Finished-Vehicle Logistics Terminal At Port Of Tianjin, China Toward The Realization Of An Eco-Friendly Green Terminal

Capt. John

Two wind turbines have started operation at a finished-vehicle logistics terminal operated by an NYK affiliate company at the port of Tianjin, China. Together with the terminal’s solar power system, which has been in operation since March 2022, the new facility will be able to supply all the...

https://www.hellenicshippingnews.com/solar-and-wind-power-generation-begins-at-finished-vehicle-logistics-terminal-at-port-of-tianjin-china-toward-the-realization-of-an-eco-friendly-green-terminal/

Leave a Comment