Jumbo Offshore Installation Contractors B.V. has been awarded a contract by MODEC Guyana Inc. for the pre-installation of the mooring spread of the FPSO Errea Wittu, which will be located offshore Guyana.
The FPSO Errea Wittu will have the capacity to store 2 million barrels of oil. It will produce approximately 250,000 barrels of oil per day and will have gas treatment capacity of 540 million cubic feet per day, and water injection capacity of 350,000 barrels per day. MODEC was authorized to...