First-ever fixed suction sails for ro-ro segment as bound4blue completes eSAILs® installation on Airbus-chartered LDA vessel

Capt. John

Following installation of eSAIL® foundations in Poland in November 2023, the 5,200-dwt Ville de Bordeaux (built 2004) has emerged from a short stopover in a shipyard in Vigo, Spain with its three brand-new, 22-metre-high eSAILs® in place. The verticalization manoeuvre and connection to the...

https://www.hellenicshippingnews.com/first-ever-fixed-suction-sails-for-ro-ro-segment-as-bound4blue-completes-esails-installation-on-airbus-chartered-lda-vessel/

Leave a Comment