In the extension of the delivery of Seaonics’ first electric gangway system to Norwind Hurricane 21st of March 2024, Norwind Offshore has placed an order for a stand-alone ECMC 7t-3D crane for newbuild 952 – Norwind Helm The crane is to be installed in connection with the delivery of the newbuild...
https://www.hellenicshippingnews.com/seaonics-ecmc-3d-crane-for-norwind-offshore-vessel/