Fremantle Ports plans to commence maintenance dredging of the Inner Harbour within this week to remove sediments that have accumulated since capital dredging was undertaken in 2010. A total dredge volume of 80,000 cubic metres will be removed over five years, with 60,000 cubic metres of sediments...