The M/V Dali ship was successfully refloated and relocated by the Key Bridge Response Unified Command after an extensive salvage operation.
The vessel, which has slowed operations in the Port of Baltimore for nearly two months, was towed to a nearby port early Monday morning (May 20, 2024).
The operation, which included five tugboats and additional support vessels, began around 6:40 a.m. EDT.
By 9 a.m., the M/V Dali had been transported 2.5 miles to a port, a...