Jan De Nul Group has signed a contract with India’s Goa Shipyard Limited (GSL) for the construction of a next generation, plug-in hybrid TSHD (trailing suction hopper dredge). With a length of 79 meters and a hopper capacity of 2,000 meters, the plug-in hybrid TSHD will be the smallest in Jan De Nul Group’s hopper fleet and is specifically designed to operate in small harbors.
The contract with Goa Shipyard is for one vessel, with a delivery period of 24 months, and includes an option to...
https://www.marinelog.com/inland-coastal/dredging/jan-de-nul-orders-next-gen-plug-in-hybrid-tshd/