Jan De Nul Group has entered into a contract with Goa Shipyard Limited (GSL) for the construction of a next-generation trailing suction hopper dredger. This advanced vessel, designed to operate in small harbours, will be a plug-in hybrid. The initial contract is for one vessel, with an option to build a second sister ship, and the first vessel is expected to be delivered within 24 months.
Details of the New VesselThe new dredger will be the smallest in Jan De Nul Group’s hopper fleet, measuring...
https://mfame.guru/jan-de-nul-group-contracts-goa-shipyard-limited-for-advanced-hybrid-dredger/