Norway’s Aker Solutions has signed a contract with Dragados Offshore to deliver the steel substructure for the 2GW HVDC converter station for the BalWin1 offshore wind grid connection system in Germany. The HVDC substructures will be fabricated in Aker Solutions’ yard in Verdal, Norway. At its...
https://splash247.com/aker-solutions-secures-work-on-german-offshore-wind-project/