Gujarat State Petronet Ltd (GSPL) commissions Chhara Gas Pipeline

Capt. John

A natural gas pipeline connecting the Greenfield 5 million tpy LNG regasification terminal at Chhara in the Gir-Somnath district with the gas grid was commissioned on 20 March 2025.

Author: Capt. John

https://www.tanksterminals.com/terminals/26032025/gujarat-state-petronet-ltd-gspl-commissions-chhara-gas-pipeline/

Leave a Comment