The Port of Gothenburg is constructing a new terminal situated on approximately 180,000 cubic metres of dredging spoils re-used as filling material. The new terminal will ..
Author: Capt. John
The Port of Gothenburg is constructing a new terminal situated on approximately 180,000 cubic metres of dredging spoils re-used as filling material. The new terminal will ..