Port Authority of Valencia awards contract for new railway line

The Port Authority of Valencia (PAV) has awarded the works to double the track and implement the third rail line between the Poniente and Levante docks in the Port of València to the joint venture between the companies TECSA Empresa Constructora and Dragados, for a total of €11,546,582.05 (VAT included), with a maximum completion period of 18 months.

Once this infrastructure is completed, it will allow the access of freight trains of 750 metres to the Levante Railway Terminal on double mixed...

https://container-news.com/port-authority-of-valencia-awards-contract-for-new-railway-line/

Leave a Comment