Mark Rayha to succeed Kevin Graney as president of Electric Boat

Mark Rayha, senior vice president and chief operating officer at General Dynamics Electric Boat, will become president of the company effective December 1, succeeding Kevin Graney, who has informed the company that he will retire at the end of the year. He will be succeeded by Mark Rayha, who currently serves as senior vice president and chief operat

“Kevin has served General Dynamics with distinction for nearly 30 years, including tenures as president of both NASSCO and Electric Boat. His...

https://www.marinelog.com/news/mark-rayha-to-succeed-kevin-graney-as-president-of-electric-boat/

Detyens wins $8.2 million USNS Arctic contract

Detyens Shipyards Inc., Charleston, S.C., has been awarded at $8,220,997 firm-fixed-price contract (N3220524C4091) for an 82 calendar day shipyard availability for a mid-term availability of Military Sealift Command’s fleet ordnance and dry cargo ship USNS Arctic (T-AOE 8).

Built by NASSCO and commissioned in 1995, USNS Arctic (T-AOE 8), formerly USS Arctic (AOE-8), is the third ship in the Supply class of fast combat support ships. Powered by four GE LM2500 gas-turbines, the ships have the...

https://www.marinelog.com/shipbuilding/shipyards/shipyard-news/detyens-wins-8-2-million-usns-arctic-contract/

Navy awards GD NASSCO a double DDG repair contract

General Dynamics NASSCO reports that it has been awarded a U.S. Navy contract for the maintenance, modernization and repair of two Arleigh Burke class destroyers, USS Chung-Hoon (DDG 93) and USS James E. Williams (DDG 95). The contract, for an initial $15.6 million, includes options that, if exercised, would bring the cumulative value to $753.8 million.

“NASSCO and our industry partners are looking forward to executing a pair of successful availabilities and are thankful the Navy has...

https://www.marinelog.com/shipbuilding/shipyards/shipyard-news/navy-awards-gd-nassco-a-double-ddg-repair-contract/

FreightWaves Classics: Ship honors Chambers, a Naval aviation pioneer

USNS Washington Chambers. (Photo: Thoralf Doehring/navysite.de)

FreightWaves Classics is sponsored by Old Dominion Freight Line. Click to find out how we can help your business keep its promises.

On September 11, 2010, the dry cargo vessel USNS (United States Naval Ship) Washington Chambers was christened and launched. The activities took place at the National Steel and Shipbuilding Company (NASSCO) shipyard in San Diego. NASSCO, which is a division of General Dynamics, has three shipyards that are located in San Diego, Norfolk, Virginia, and Mayport,...

https://www.freightwaves.com/news/freightwaves-classics-ship-honors-chambers-a-naval-aviation-pioneer

NASSCO awarded 2 Navy LLT contracts for 3 ships

General Dynamics National Steel and Shipbuilding Co. (NASSCO), San Diego, Calif., has been awarded two Navy long-lead-time (LLT) contracts that together are worth $600 contracts.

The larger of the two is a $500,000,000 modification to previously awarded contract N00024-16-C-2229 to procure long-lead-time material in support of T-AO 211 and T-AO 212.

The other is a $100,000,000 modification to previously awarded contract N00024-19-C-2235 for the procurement of long-lead-time material in support of

https://www.marinelog.com/shipbuilding/nassco-awarded-2-navy-llt-contracts-for-3-ships/