Dutra Group awards dredge contract to Eastern Shipbuilding

San Rafael, Calif.-based The Dutra Group announced March 21 the issuance of a Notice to Proceed for the new-build construction of a 10,464-cubic-yard Trailing Suction Hopper Dredge (TSHD) the Adele at Eastern Shipbuilding Group Inc.

The Adele will be constructed at Eastern Shipbuilding Group’s Allanton and Port St. Joe, Fla., facilities. Delivery is scheduled for late 2028. The Adele will join The Dutra Group’s 9,870-cubic-yard TSHD Stuyvesant serving our nation’s essential waterways.

The Dutra...

https://www.marinelog.com/news/dutra-group-awards-dredge-contract-to-eastern-shipbuilding/

Jan De Nul orders next gen plug-in hybrid TSHD

Jan De Nul Group has signed a contract with India’s Goa Shipyard Limited (GSL) for the construction of a next generation, plug-in hybrid TSHD (trailing suction hopper dredge). With a length of 79 meters and a hopper capacity of 2,000 meters, the plug-in hybrid TSHD will be the smallest in Jan De Nul Group’s hopper fleet and is specifically designed to operate in small harbors.

The contract with Goa Shipyard is for one vessel, with a delivery period of 24 months, and includes an option to...

https://www.marinelog.com/inland-coastal/dredging/jan-de-nul-orders-next-gen-plug-in-hybrid-tshd/

Dutch Dredging orders new 2,300 cubic meter TSHD

Sliedrecht, Netherlands, headquartered Baggerbedrijf de Boer – Dutch Dredging BV has awarded Royal IHC a contract for the design and construction of a custom-built trailing suction hopper dredge (TSHD) with a hopper capacity of 2,300 cubic meters. The new TSHD will be an upgrade of theLesse, a TSHD that was delivered by Royal IHC to Dutch Dredging in 2019 and that has since been working worldwide

Royal IHC has already built four custom-built vessels for Dutch Dredging. The Lesse, the most...

https://www.marinelog.com/inland-coastal/dredging/dutch-dredging-orders-new-2300-cubic-meter-tshd/

Boskalis orders a methanol-ready megahopper

megahopper how it works

Two leading Dutch players are again pushing dredge technology forward. Following an extensive design phase that began in 2020, Boskalis has signed a contract with Royal IHC for a giant methanol-ready trailing suction trailing suction hopper dredge (TSHD). With a hopper volume of 31,000 cubic meters (40,546 cubic yards), it’s being described by Boskalis as a megahopper.

To be built at Royal IHC’s Krimpen aan den IJssel shipyard in the Netherlands, the vessel’s energy-efficient design will feature...

https://www.marinelog.com/uncategorized/boskalis-orders-a-methanol-ready-megahopper/

Dutch Barge Transformed into High-Efficiency Dredger for Nigeria

Credit: Concordia Damen

Concordia Damen achieves a remarkable feat by converting a Dutch inland shipping barge into a highly efficient Trailing Suction Hopper Dredger (TSHD) for a Nigerian dredging company, offering cost-effective and rapid solutions for the industry. The maritimejournal source.

  • Concordia Damen successfully converts a Dutch inland shipping barge into a Trailing Suction Hopper Dredger (TSHD) for a Nigerian dredging company, offering cost-efficiency and rapid delivery.
  • The complex...

https://mfame.guru/dutch-barge-transformed-into-high-efficiency-dredger-for-nigeria/

Keppel O&M delivers first dual-fuel dredge built in Singapore

Rotterdam-headquartered Van Oord has taken delivery of the first of a series of three trailing suction hopper dredges (TSHDs) from Keppel Offshore & Marine Ltd. Named Vox Ariane, and with a hopper capacity of 10,500 cubic meters, it can run on LNG.

Van Oord orders third dredge at Keppel FELS

“We are pleased to deliver the first dual-fuel dredge built in Singapore to Van Oord,” said Tan Leong Peng, managing director (new builds) at Keppel O&M. “This is the sixth dredge delivered by Keppel O&M,...

https://www.marinelog.com/inland-coastal/dredging/keppel-om-delivers-first-dual-fuel-dredge-built-in-singapore/

Keppel Bags $96m LNG-ready Dredger and FPSO Upgrade Contract

  • Subsidiaries of Singapore’s Keppel Offshore & Marine (Keppel O&M) have clinched contracts worth approximately SGD130m ($95.7m) for a newbuild LNG-ready dredger and the modification of an FPSO vessel. 
  • The contract with Van Oord is to build a high specification TSHD following an option granted to Van Oord based on earlier contracts. 
  • Upon completion, the FPSO will have a storage capacity of 700,000 barrels of oil and a processing capacity of 60,000 barrels of oil per day, and deployed in Anyala...

http://mfame.guru/a-96m-contract-fetches-lng-ready-dredger-and-fpso-upgrade-for-keppel/