The structure and technics at Kiel’s shunting station in Meimersdorf have been enhanced in such a way that freight trains with an effective length of 740 m (535 m before) can enter and exit the station as of now.
Author: Capt. John
https://www.ferryshippingnews.com/longer-trains-for-port-of-kiel/