Longer Trains For Port Of Kiel

Capt. John

The structure and technics at Kiel’s shunting station in Meimersdorf have been enhanced in such a way that freight trains with an effective length of 740 m (535 m before) can enter and exit the station as of now.

Source

Author: Capt. John

https://www.ferryshippingnews.com/longer-trains-for-port-of-kiel/

Leave a Comment