Video has surfaced on YouTube showing the collapse of a massive Liebherr offshore crane during load testing on the DEME offshore installation vessel Orion 1. Built in China, the vessel is designed to service offshore wind installation and for oil & gas and decommissioning activities.
It arrived at Liebherr’s Rostock, Germany, facility on November 22, 2019, for assembly and installation of the giant 90 meter high Liebherr TLC crane, which has a 160 meter long boom and will have a lifting height...