President Lech Kaczyński LNG terminal to be expanded

Capt. John
Polskie LNG signed a contract for the extension of the existing LNG regasification installation with additional SCV (Submerged Combustion Vaporiser) regasification devices. As a result, the current regasification capacity of the President Lech Kaczyński LNG Terminal will be increased 50%.

The contract regards the design of the installation and assembly of LNG regasifier and cryogenic pumps. This investment aims to extend the functionality and technical capabilities of the terminal in Świnoujście.

https://safety4sea.com/president-lech-kaczynski-lng-terminal-to-be-expanded/

Leave a Comment

Join Our Newsletter
Enter your email to receive a weekly round-up of shipping news.
icon